Solar Grounding Washers and Electrical Bonding Requirements

  • Home
  • Science and technology
Solar Grounding Washers and Electrical Bonding Requirements

Solar Grounding Washers and Electrical Bonding Requirements

PV racking not only holds modules but also forms continuous equipotential grounding to prevent lightning and leakage. Grounding (star/toothed) washers are key to electrical bonding between module frames and rails.

How It Works

Anodized module frames and galvanized rails have non-conductive coatings; plain washers cannot conduct. Grounding washers have sharp teeth that penetrate anodizing and zinc coating during installation, forming a metal-to-metal low-resistance path for equipotential bonding.

Selection and Installation

Commonly 304/316 stainless toothed grounding washers are used with module clamp bolts. Install to manufacturer torque so teeth embed without cracking frames. Design at least two reliable bond points per module-to-rail connection.

Resistance Requirements

System grounding resistance typically ≤4Ω per local code; transition resistance between bond points recommended ≤0.1Ω. Post-installation, test with micro-ohmmeter抽样 to confirm continuity.

The solar fastener range supplies grounding washers, module clamps and grounding solutions.

Contact

Contact: Lizhong Deng

Phone: 13928071304

Tel: +86-756-8586520

Email: sales@jlfastener.com

Add: Room 56-301,Mingzhubeilu 388hao,Xiangzhou Area,Zhuhai City,GuangDong,China